North Shore LIJ – Glen Cove Hospital (2014)
Posted in Civil ServicesInstalled new drainage pools 25ft underground, complete with vertical wick totaling 56 feet down through clay layer into existing bank run sublayer so that storm water could drain. Installed improved catch basins and piping. Site concrete and asphalt paving in parking lot.