Pratt Institute – 2024
As part of the ongoing NYC DEP Green Infrastructure Program, Galvin Bros., Inc. was contracted
Read more
Sylvan Ave Historic Restoration – 2024
Performed as a subsidiary during the construction of NYC DEP Green Infrastructure Program at Greenwood
Read more
T Mina Supply Yard – 2024
As part of the ongoing NYC DEP Green Infrastructure Program, Galvin Bros., Inc. was contracted
Read more
Greenwood Practice Area 3 – 2024
As part of the ongoing DEP Green Infrastructure Program at Greenwood Cemetery, Galvin Bros., Inc.
Read more
Greenwood Practice Area 2 – 2024
As part of the ongoing NYC DEP Green Infrastructure Program at Greenwood Cemetery, Galvin Bros.,
Read more
Greenwood Practice Area 1 – 2024
As part of the ongoing NYC DEP Green Infrastructure Program, Galvin Bros., Inc. was contracted
Read more
Shorefront Park Living Shoreline and Little Creek Restoration
The Living Shoreline and Litte Creek Restoration Project at Shorefront Park for the Village of
Read more
Bailey Arboretum (2023)
Galvin Bros, Inc was contracted by the Nassau County Department of Public Works to perform
Read more
Tobay Beach Marina (2023)
Galvin Bros., Inc. was contracted by the Town of Oyster Bay to rebuild the bulkhead
Read more
NYC Pier 42 (2022)
Galvin Bros., Inc. was contracted by The Liro Group to repair and Construct Recreation areas
Read more
Mill Neck Estates Water Supply Improvements – Mill Neck, NY (2020-2021)
In 2020 Galvin Bros. was contracted by New York American Water to replace the existing
Read more
Saw Mill Creek Mitigation Bank project (2018)
Project Cost: $9,500,000 Saw Mill Creek is the first state and federally approved mitigation bank
Read more
Water Quality Improvements at Gerry Park – Roslyn, NY (2020-2021)
GBI worked alongside Cameron Engineering and the town of North Hempstead to provide water quality
Read more
Plant 7 Water Storage Tank Rehabilitation – Valley Stream, NY (2020)
GBI was contracted by New York American Water to remove the reinforced concrete dome from
Read more
NYC EDC West 10th Street (2014-2016)
Galvin Bros., Inc was contracted by NYC EDC to convert West 10th St., a dead
Read more
North Shore LIJ – Huntington Hospital (2014 – 2016)
Participated in a make-ready project for new construction which included re-routing electrical duct banks, re-routing
Read more
North Shore LIJ – Glen Cove Hospital (2014)
Installed new drainage pools 25ft underground, complete with vertical wick totaling 56 feet down through
Read more
Town of Islip Resource Recovery Agency (2014)
Installed concrete truck wash platform that drained to sealed underground tank for washing down contaminated
Read more
Private Owner – Residence (2014)
GBI undertook a difficult task of clearing, grubbing and regrading of over 4 acres of
Read more
The Village of Sea Cliff – Scudders Pond (2013-2014)
Dredged and removed over 5,000 cubic yards of contaminated material from the pond to improve
Read more
NYC DPR – Hurricane Sandy Clean Up in Coney Island (2013)
Removed over 20,000 cubic yards of sand and debris from Coney Island streets after Hurricane
Read more
New York City EDC – Hunters Point South, NY
The Hunters Point South Waterfront Park is the first phase of a proposed 11-acre public
Read more
DASNY – CUNY Brooklyn College (2011-2012)
Brooklyn College had an existing Asphalt Running Track Surrounding an Existing Grass Field. GBI excavated
Read more
Tully Park – New Hyde Park, NY (2010)
To begin the sanitary sewer upgrade project for the Town of North Hempstead, GBI abandoned
Read more
NYC EDC – Hunt’s Point Landing – Bronx, NY
Galvin Brothers worked with the New York City Economic Development Corporation to transform a blighted
Read more
MacArthur Airport – Islip, NY (2010)
GBI was contracted by New York State Office of General Services to demolish the existing
Read more
DSNY Salt Shed, 125th Street – Bronx, NY (2010)
This project involved the construction of a 26,000 square foot salt storage building for the
Read more
LI Jewish Women’s Hospital – Glen Oaks, NY (2009)
GBI coordinated with Long Island Jewish Medical Center to construct the foundation of the new
Read more
NYS Parks – Roberto Clemente Pool (2008)
Replaced original pool drainage and filtration pipe and re-finished deteriorating concrete surface of pool. Improved
Read more
Shore Parkway Seawall – Bay Ridge, Brooklyn (2007)
The rehabilitation of this two mile stretch of Shore Parkway from the 69th Street Pier
Read more
Long Island Jewish Medical Center Parking Structure – Glen Oaks, NY (2007)
GBI began constructing the structural foundation for a new seven story parking building by excavating
Read more
Mill Dam Bridge – Centerport, NY (2005)
Located between Mill Pond and Centerport Harbor, Mill Dam Bridge was once the site of
Read more
LIRR Employee Facility – Garden City, NY
GBI was contracted to construct a 9,000 square foot maintenance facility from the ground-up in
Read more